Saturday, September 19, 2026
Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Live show at the Legion, September 26

Johnny Spinks and Koolwater and Whisky Sour...

For sale: battery-powered fans. deck box

Two Ryobi 18 V battery-powered fans with...
EnerduEnerdu: Objection

Enerdu: Objection

by Trish Dyer 

 

The headpond/dam configuration would allow Enerdu to release or drop water down through a new turbine at a rate of up 118 cubic metres per second. The Authority’s position is that is beyond the operating range set out and agreed to by Enerdu previously as part of the ongoing Water Management Plan. 

Related

FOLLOW US

Latest

From the Archives