by Trish Dyer
The headpond/dam configuration would allow Enerdu to release or drop water down through a new turbine at a rate of up 118 cubic metres per second. The Authority’s position is that is beyond the operating range set out and agreed to by Enerdu previously as part of the ongoing Water Management Plan.